4 tonne wood coal fired boiler manufacturer tanzania

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

4 tonne wood coal fired boiler manufacturer tanzania have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


4 tonne wood coal fired boiler manufacturer tanzania.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
News around the world - Neueste Beiträge zuerst (Seite 20

News around the world - Neueste Beiträge zuerst (Seite 20

Coal Project in Southern Tanzania, have arrived @a dedicated coal laboratory 325.000.000 - 490.000.000tonnes @4-9% Cg, Nachu tenement "ha

Tanzania Portland Cement : Twiga eyes 1.5m tonnes | 4-Trade

Tanzania Portland Cement : Twiga eyes 1.5m tonnes | 4-Trade

Dar es Salaam. Tanzania Portland Cement, which trades as Twiga Cement, said at the weekend that its production targets will not be deterred

Travers on Twitter: "Pres of Tanzania to destroy 80 tonn

Travers on Twitter: "Pres of Tanzania to destroy 80 tonn

Close Are you sure you want to delete this Tweet? Cancel Delete Close Promote this Tweet Close Block Cancel Block Add a location to your Tweets

: commissions 3m tonne Tanzania cement plant tomorrow |

: commissions 3m tonne Tanzania cement plant tomorrow |

Log in Login Password Remember Lost password Become a member for free Sign up Sign up New member Sign up for FREE New customer

Tanzania: Ngaka Coal Mine Can Produce Around 300 Millio

Tanzania: Ngaka Coal Mine Can Produce Around 300 Millio

THE Ngaka coalfield in Ruvuma Region has the capacity to produce 286.99 million metric tonnes of proven coal in its basin, the National

Three Million Tonne Tanzania Cement Plant Tomorrow |

Three Million Tonne Tanzania Cement Plant Tomorrow |

Log in Login Password Remember Lost password Become a member for free Sign up Sign up New member Sign up for FREE New customer