gas boiler model x3 in south africa

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

gas boiler model x3 in south africa have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


gas boiler model x3 in south africa.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
- Double Rings (China Manufacturer) - Boilers - Machine

- Double Rings (China Manufacturer) - Boilers - Machine

Wns4-1.25-q Fuel Gas Burner 4 Ton Superheated Steam Boiler WNS4-1.25-Y(Q) - Double Rings Products Made In China, China Manufacturer. Products

Accessing the X3 plug for Vitodens 200 w Installatio

Accessing the X3 plug for Vitodens 200 w Installatio

Models 19, 26, 35Wall-mounted, gas-fired condensing boiler Vitodens 200-W 2.Remove the X3 plug from the control board. Attach sensors and

gas pipe to boiler, system commissioning | Oxford OX3 7A

gas pipe to boiler, system commissioning | Oxford OX3 7A

Oxford: connecting gas pipe to boiler, system commissioning - connecting gas pipe to boiler, system commissioning Would you mind providing me a

Baxi Solo 24 HE boiler - heat exchanger broken x3 in a ye

Baxi Solo 24 HE boiler - heat exchanger broken x3 in a ye

Hi I'm not attempting to do any DIY but wanted to get some advice and opinions. I had 2 brand new Baxi solo HE boilers installed in June 2010

South Leigh Plumbers - BusinessFi

South Leigh Plumbers - BusinessFi

Local Plumbers in South LeighGet your listing. Just £74.99 per year 39 York Road, Headington, Oxford OX3 8NR07702 285 263 Boiler Repairs,

Gasket - Francis X1,X3,X5 / Bugatti Diva - Brass Boile

Gasket - Francis X1,X3,X5 / Bugatti Diva - Brass Boile

Group Gasket - Francis X1,X3,X5 - This Will Fit The X1,X3,X5 Model With The Brass Boiler And The Bugatti Diva Group Gasket - Francis X1,X3,X5

Riello Burners Italy, Riello Burners Italy Suppliers an

Riello Burners Italy, Riello Burners Italy Suppliers an

Model Number: RD-GT014-3 Tags: Glass Top (gas) steam boiler,RIELLO ITALY burner,USA WATER External Size: 7000x5200x3600mm Internal Size:

Oil Boilers - WNS - Double Rings (China Manufacturer)

Oil Boilers - WNS - Double Rings (China Manufacturer)

Oil Boilers WNS - Double Rings Products Made In China, China Manufacturer. Products Instruction : WNS series steam boiler burning oil or gas is Horizontal

About The Weil-McLain 80 Series Commercial Gas/Oil Boil

About The Weil-McLain 80 Series Commercial Gas/Oil Boil

Remove In this conversation Verified accountProtected Tweets @ Suggested users Verified accountProtected Tweets @ Verified accountProtected Twee

1228 Technox3 840 BT-Use and Maintenance Manual(en) | Boile

1228 Technox3 840 BT-Use and Maintenance Manual(en) | Boile

In case of boiler fonctioning with gas fired pressure jet burner, the For larger models (Technox3 500BT to Tecnox3 1900BT) the furnace is

and reboilers for Oil and Gas Production Handbook Ed1x3a

and reboilers for Oil and Gas Production Handbook Ed1x3a

Oil and Gas Production Handbook Ed1x3a5 Comp - Free download as PDF File (.pdf), Text file (.txt) or read online for free. This handbook is

Vntg Enamel POTS x3 Stock Pot Double Boiler Pot w/LIDS WHIT

Vntg Enamel POTS x3 Stock Pot Double Boiler Pot w/LIDS WHIT

Vntg Enamel POTS x3 Stock Pot Double Boiler Pot w/LIDS WHITE Enamelware Soup Pot About PlusModels Contact Us Terms of Use Plus Size Modeling News

About The Weil-McLain 80 Series Commercial Gas/Oil Boil

About The Weil-McLain 80 Series Commercial Gas/Oil Boil

Remove In this conversation Verified accountProtected Tweets @ Suggested users Verified accountProtected Tweets @ Verified accountProtected Twee

and reboilers for Oil and Gas Production Handbook Ed1x3a

and reboilers for Oil and Gas Production Handbook Ed1x3a

Oil and Gas Production Handbook Ed1x3a5 Comp - Free download as PDF File (.pdf), Text file (.txt) or read online for free. This handbook is

Oil Boilers - WNS - Double Rings (China Manufacturer)

Oil Boilers - WNS - Double Rings (China Manufacturer)

Oil Boilers WNS - Double Rings Products Made In China, China Manufacturer. Products Instruction : WNS series steam boiler burning oil or gas is Horizontal

steam boiler China (Mainland) Boile

steam boiler China (Mainland) Boile

Main Markets:North America,South America,Eastern Europe,Southeast Asia,Africa Product/Service (We Sell):Steam and hot water boiler,coal(

New Boiler, Repair & Service Oxford | Boiler Gui

New Boiler, Repair & Service Oxford | Boiler Gui

South Central Oxford OxfordFind boiler and pick the right type and model for your needs. Oxford (OX3) 10 Apr New Gas Boiler Current

gas pipe to boiler, system commissioning | Oxford OX3 7A

gas pipe to boiler, system commissioning | Oxford OX3 7A

Oxford: connecting gas pipe to boiler, system commissioning - connecting gas pipe to boiler, system commissioning Would you mind providing me a

New Boiler, Repair & Service Oxford | Boiler Gui

New Boiler, Repair & Service Oxford | Boiler Gui

South Central Oxford OxfordFind boiler and pick the right type and model for your needs. Oxford (OX3) 10 Apr New Gas Boiler Current

South Leigh Plumbers - BusinessFi

South Leigh Plumbers - BusinessFi

Local Plumbers in South LeighGet your listing. Just £74.99 per year 39 York Road, Headington, Oxford OX3 8NR07702 285 263 Boiler Repairs,

Accessing the X3 plug for Vitodens 200 w Installatio

Accessing the X3 plug for Vitodens 200 w Installatio

Models 19, 26, 35Wall-mounted, gas-fired condensing boiler Vitodens 200-W 2.Remove the X3 plug from the control board. Attach sensors and