boiler FBC 25 TPH 380 degree pressure 2 6 Mpa

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

boiler FBC 25 TPH 380 degree pressure 2 6 Mpa have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


boiler FBC 25 TPH 380 degree pressure 2 6 Mpa.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
Solcon India - Specialising in executing turnkey projects f

Solcon India - Specialising in executing turnkey projects f

60 TPH (Tons Per Hour) Coal/Lignite Handling Plant for our FBC Boilers Solcon has supplied two numbers of Screw Conveyors having Dia. 450 x 8

cost of 45 tph fbc boil

cost of 45 tph fbc boil

cost of 45 tph fbc boilerVSI Crusher VSI5X Crusher VSI Crusher Vibrating Screen Vibrating Feeder T130X Reinforced Ultrafine Mill S

Used nichiyu FBC18PN-70BC Counterbalance Forklift in Acaci

Used nichiyu FBC18PN-70BC Counterbalance Forklift in Acaci

Buy Used nichiyu FBC18PN-70BC Nichiyu FBC18PN 70BC battery electric forklift for sale by Adaptalift Group - Acacia Ridge. Nichiyu FBC18PN-70BC batt

THERMAX STEAM BOILERS - THERMAX Steam Boiler Coil Type No

THERMAX STEAM BOILERS - THERMAX Steam Boiler Coil Type No

THERMAX STEAM BOILERSThermax Offers Steam boilers 2;), 1.0 & 1.5 TPH (10.54 kg/cm2;) Thermax Combipac Fbc Boiler - Ibr 3/4/5/6

Bed Tube Failure Diagnosis- Final Report by Venus 19 Dec 20

Bed Tube Failure Diagnosis- Final Report by Venus 19 Dec 20

TPH FBC BOILER AT APOLLO TYRES, CHENNAI seen in photos 4, 5 and 6 of annexure 1header is provided with two 200 nb down

Final Inspection of 135 TPH FBC Boiler - 27

Final Inspection of 135 TPH FBC Boiler - 27

Final Inspection of 135 TPH FBC Boiler - 27 F - Free download as Text file (.txt), PDF File (.pdf) or read online for free. P. 1 Final In

65 TPH Fludized Bed Combustion FBC Boil

65 TPH Fludized Bed Combustion FBC Boil

65 TPH means the capacity of the FBC boiler is 65 ton per hour.65 TPH Fludized Bed Combustion FBC Boiler have wide application such as various

PDFOne No. 8 TPH 10 kg/cm2 FBC CVL Boiler Firing with agro fuel

PDFOne No. 8 TPH 10 kg/cm2 FBC CVL Boiler Firing with agro fuel

One No. 8 TPH 10 kg/cm2 FBC CVL Boiler Firing with agro fuels. Make Capacity : 8000 kg/hr Registered Working Pressure : 11.25 kg/cm2

Bed Tube Failure Diagnosis- Final Report by Venus 19 Dec 20

Bed Tube Failure Diagnosis- Final Report by Venus 19 Dec 20

TPH FBC BOILER AT APOLLO TYRES, CHENNAI PLANT be seen in photos 4, 5 and 6 of annexure 1There are two criterion checked. The pressure