Industrial boilers
Product thermal capacity: 4-35 t/h
Working pressure: 1.0-2.5 MPA
Outlet temperature: 184-350 ℃
Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil
Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries
Thermal Oil Boiler Of Taiwan have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.
Thermal Oil Boiler Of Taiwan.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).
2005-7-26·When they got in the boiler room they were almost stifle d by the heat. He is a very versatile Many rivers in Taiwan are polluted with filthy waste from factories. he is
2009-3-16·Boiler Circulation Pumps for thermal power long lead time, 12 to 15 months, £ 200k to £500 k plants engineered by project also stocked in Taiwan) Rotating joints
2009-3-16·Boiler Circulation Pumps for thermal power long lead time, 12 to 15 months, £ 200k to £500 k plants engineered by project also stocked in Taiwan) Rotating joints
2005-7-26·When they got in the boiler room they were almost stifle d by the heat. He is a very versatile Many rivers in Taiwan are polluted with filthy waste from factories. he is
2015-1-21·0 0 8 0 8 0 8 20 8 0 8 20 8 0 89.1 0 89.1 0 89.1 0 40 40 0 0 89.1 0 89.1 0 89.1 0 40 40 0 0 89.1 0 89.1 0 89.1 0 40 40 0 0 18 0 18 18 0 0 8 20 8 20 8 20 9 0 9 9 20
2009-3-16·Boiler Circulation Pumps for thermal power long lead time, 12 to 15 months, £ 200k to £500 k plants engineered by project also stocked in Taiwan) Rotating joints
2015-1-21·0 0 8 0 8 0 8 20 8 0 8 20 8 0 89.1 0 89.1 0 89.1 0 40 40 0 0 89.1 0 89.1 0 89.1 0 40 40 0 0 89.1 0 89.1 0 89.1 0 40 40 0 0 18 0 18 18 0 0 8 20 8 20 8 20 9 0 9 9 20
2003-6-2·(reach Europe III Standard) 69 Fueling battery for automobile 70 High-pressure oil supply system for synthetic quartz crystal 76 High-performance synthetic mica and
2008-8-28·ANSYS_HARVARD_THERMAL_PTD ANSYS_HARVARD_THERMAL_TAS ANSYS_HARVARD_THERMAL_TASPCB Ansys DesignerSpace v6.1
2005-7-26·When they got in the boiler room they were almost stifle d by the heat. He is a very versatile Many rivers in Taiwan are polluted with filthy waste from factories. he is
2005-7-26·When they got in the boiler room they were almost stifle d by the heat. He is a very versatile Many rivers in Taiwan are polluted with filthy waste from factories. he is
2008-8-28·ANSYS_HARVARD_THERMAL_PTD ANSYS_HARVARD_THERMAL_TAS ANSYS_HARVARD_THERMAL_TASPCB Ansys DesignerSpace v6.1
2003-6-2·(reach Europe III Standard) 69 Fueling battery for automobile 70 High-pressure oil supply system for synthetic quartz crystal 76 High-performance synthetic mica and
2015-1-21·0 0 8 0 8 0 8 20 8 0 8 20 8 0 89.1 0 89.1 0 89.1 0 40 40 0 0 89.1 0 89.1 0 89.1 0 40 40 0 0 89.1 0 89.1 0 89.1 0 40 40 0 0 18 0 18 18 0 0 8 20 8 20 8 20 9 0 9 9 20
2005-7-26·When they got in the boiler room they were almost stifle d by the heat. He is a very versatile Many rivers in Taiwan are polluted with filthy waste from factories. he is
2005-7-26·When they got in the boiler room they were almost stifle d by the heat. He is a very versatile Many rivers in Taiwan are polluted with filthy waste from factories. he is
2003-6-2·(reach Europe III Standard) 69 Fueling battery for automobile 70 High-pressure oil supply system for synthetic quartz crystal 76 High-performance synthetic mica and
2008-8-28·ANSYS_HARVARD_THERMAL_PTD ANSYS_HARVARD_THERMAL_TAS ANSYS_HARVARD_THERMAL_TASPCB Ansys DesignerSpace v6.1
2009-3-16·Boiler Circulation Pumps for thermal power long lead time, 12 to 15 months, £ 200k to £500 k plants engineered by project also stocked in Taiwan) Rotating joints
2008-8-28·ANSYS_HARVARD_THERMAL_PTD ANSYS_HARVARD_THERMAL_TAS ANSYS_HARVARD_THERMAL_TASPCB Ansys DesignerSpace v6.1
2015-1-21·0 0 8 0 8 0 8 20 8 0 8 20 8 0 89.1 0 89.1 0 89.1 0 40 40 0 0 89.1 0 89.1 0 89.1 0 40 40 0 0 89.1 0 89.1 0 89.1 0 40 40 0 0 18 0 18 18 0 0 8 20 8 20 8 20 9 0 9 9 20