medupi power station boiler

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

medupi power station boiler have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


medupi power station boiler.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
Medupi Power Plant produces first electricity - SaveMon

Medupi Power Plant produces first electricity - SaveMon

Business Business Insurance Professional Legal Household Household Insurance Building Insura

Medupi power station's completion delayed | Business

Medupi power station's completion delayed | Business

Medupi power station's completion delayed It was announced on Monday at a press conference that the first unit of the Medupi station wil

MHPS Delivers 3rd Boiler to Medupi Power Station in Sout

MHPS Delivers 3rd Boiler to Medupi Power Station in Sout

(MHPS), in cooperation with group companies in Africa and Europe, has completed delivery of the third boiler unit of the Medupi Power Station(1)

All quiet at Medupi power station | ESI-Africa.c

All quiet at Medupi power station | ESI-Africa.c

Johannesburg, South Africa --- ESI-AFRICA.COM --- 25 May 2011 - The scene at national power utility Eskoms Medupi power station, near

Topic - Medupi Power Pla

Topic - Medupi Power Pla

Barradas 14th July 2017 Eskom signed a loan agreement with the China Development Bank, which will form part of the funding for the Medupi power plant

Related articles: Medupi Power Station | Pearltre

Related articles: Medupi Power Station | Pearltre

Related Articles: ANC Durban leadership. Related Articles:Kusile Power Station. Former Medupi construction workers go on rampage:Tuesday 8 September 2015 R

Contractors 'threaten' Medupi worke

Contractors 'threaten' Medupi worke

Trade union Numsa says workers at Eskoms Medupi power plant have received threatening text messages from contractors after a strike on

Currently 43 Medupi Power Station Jobs - Mitula Jo

Currently 43 Medupi Power Station Jobs - Mitula Jo

Choose from 43 medupi power station jobs on South Africa's biggest job offers site. Find your next opportunity and apply today!. Available position:

Strikes at Medupi power station continue | The Citiz

Strikes at Medupi power station continue | The Citiz

FILE PICTURE: The view from boiler unit six at the Medupi power employees hired by Eskom contractors at the power station went on

Medupi Timeline: Costs, delays spiralling no completion

Medupi Timeline: Costs, delays spiralling no completion

Helen Suzman Foundation's Elias Phaahla looks at the progress of Eskom's long-delayed Medupi power station. to blame for the mess at Esko

Control And Instrumentation System For Medupi Power Plan

Control And Instrumentation System For Medupi Power Plan

Alstom’s work on Eskom’s Medupi power station in South Africa took a major step forward for Eskom’s target date for synchr

Medupi Power Station - Wikipedia, the free encycloped

Medupi Power Station - Wikipedia, the free encycloped

The Medupi Power Station is a new dry-cooled coal-fired power station When completed, the power station is to have six boilers each powering an

PDFFirst boiler column set at the 4800 MW Medupi power plant

PDFFirst boiler column set at the 4800 MW Medupi power plant

First boiler column set at the 4800 MW Medupi power plant A Milestone for the Supply of Energy in South Africa Duisburg, 18.01.2010. It is the

Power Station Fans | TLT-Tur

Power Station Fans | TLT-Tur

We are one of the world-market leaders for first-class power stations fans. Our products can be found in the world's most demanding projects our

Progress continues for Medupi power station project | Minin

Progress continues for Medupi power station project | Minin

At the Medupi power plant is on track to start generating power in the One hour test runs on the Unit 6 boiler mills have also been completed

Vehicle Barriers for Medupi power station - Turnst

Vehicle Barriers for Medupi power station - Turnst

Turnstar recently received an order for 4 TRAFFIC MASTER automatic vehicle barriers for the Medupi Power Station project in Mpumalanga, Sout

Eskoms Medupi Power Station on Schedu

Eskoms Medupi Power Station on Schedu

Medupi Power Station, a Greenfields coal-fired plant project located on the west of Lephalale, Limpopo Province

Matla Power Station - Wikiped

Matla Power Station - Wikiped

Lethabo Power Station Majuba Power Station Matimba Power Station Matla Power Station Medupi Power Station Pretoria West Power Station Rooiwal Power Station Tu

Eskom extends Medupi's power delivery date | Africa News Wi

Eskom extends Medupi's power delivery date | Africa News Wi

Pretoria: Eskom's Medupi coal fired power station in Limpopo is unlikely to deliver first power to the grid by the end of this year as it

Komati Power Station - Wikiped

Komati Power Station - Wikiped

Lethabo Power Station Majuba Power Station Matimba Power Station Matla Power Station Medupi Power Station Pretoria West Power Station Rooiwal Power Station Tu

My Power Station South Afri

My Power Station South Afri

(1) community power station (2) Community Solar (3) Compressed Air Energy Storage (2) computer science (1) Conference (6) Content Generator (1) cop