STEAM TURBINE 4 MW hot water boiler

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

STEAM TURBINE 4 MW hot water boiler have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


STEAM TURBINE 4 MW hot water boiler.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
Vestas 4 MW wind turbines debuts Chinas distributed win

Vestas 4 MW wind turbines debuts Chinas distributed win

Vestas 4 MW wind turbines debuts Chinas distributed wind power market June 28, 2019 reve Vestas has secured its first 4 MW platform order

combined cycle gas turbi

combined cycle gas turbi

Heat transfer from hot gases to water and steamSteam turbine, 3-Condenser, 4-Pump, 5-Boiler/MW primary gas turbine coupled to a 130 MW

Steam Turbine, Steam Boiler, Power Plant, Steam Power: Foru

Steam Turbine, Steam Boiler, Power Plant, Steam Power: Foru

Sync Steam Turbine Generator - Basem Belal [2194] - Friday, January 11, 2019 277 Views Boiler pressure control View All - Hadi [2292] - Monday,

Steam Turbine, Steam Boiler, Power Plant, Steam Power: Foru

Steam Turbine, Steam Boiler, Power Plant, Steam Power: Foru

Sync Steam Turbine Generator - Basem Belal [2194] - Friday, January 11, 2019 277 Views Boiler pressure control View All - Hadi [2292] - Monday,

combined cycle gas turbi

combined cycle gas turbi

Heat transfer from hot gases to water and steamSteam turbine, 3-Condenser, 4-Pump, 5-Boiler/MW primary gas turbine coupled to a 130 MW

105 Mw Siemens V94.2 Gas Turbine Power Plant | dartmouth

105 Mw Siemens V94.2 Gas Turbine Power Plant | dartmouth

Product: 105 Mw Siemens V94 2 Gas Turbine Power Plant from Canada at Offers to Sell and Export Dated Mon 07 Jun, 2010 6:30 pm 105 MW Siemens

Steam Turbine, Steam Boiler, Power Plant, Steam Power: Foru

Steam Turbine, Steam Boiler, Power Plant, Steam Power: Foru

Sync Steam Turbine Generator - Basem Belal [2194] - Friday, January 11, 2019 277 Views Boiler pressure control View All - Hadi [2292] - Monday,

CFB Boiler, 30 MW steam turbine, CFB Boiler in Roman

CFB Boiler, 30 MW steam turbine, CFB Boiler in Roman

Lukoils plans to modernise its power plant in Ploiesti Romania refinery were established by contracting and installing a 30 MW steam turbine at the

5 mw natural gas industrial water boiler compa

5 mw natural gas industrial water boiler compa

Home WNS Oil Gas Fired Hot Water Boiler WNS Oil Gas Steam Boiler About .5MW Gas Turbines Generator Sets and one GE 276MW D10 steam turbine

Gas Turbines for the Oil & Gas Market (2013-2024): Turbin

Gas Turbines for the Oil & Gas Market (2013-2024): Turbin

DUBLIN, July 2, 2019 /PRNewswire/ -- The "Gas Turbine Market for Oil and Gas Industry Report: Trends, Forecast and Competitive

4mw steam turbine | biomass fuel boil

4mw steam turbine | biomass fuel boil

4mw steam turbine2015-09-30 GE Gas Turbine and OEM spare parts EPC Contractor, Equipments and Genuine OEM Spare Parts Supplier

Global Sizing of the WindFloat for a 10 MW Generic Wind Turbi

Global Sizing of the WindFloat for a 10 MW Generic Wind Turbi

San Francisco, California, USA, November 47,complimentary when sites span a large water depththe WindFloat for a 10 MW Generic Wind Turbine

600MW level supercritical steam turbine - CE

600MW level supercritical steam turbine - CE

Capacity:600MWMain steam pressure:24.2MpaMain steam temperature:566?Reheat steam temperature:566?<br> :Home»Products»Thermal »Turbine»600MW lev

3 Pass Coal Wood Fired Boilers With Steam Turbine 3 M

3 Pass Coal Wood Fired Boilers With Steam Turbine 3 M

1-30t/h 4bar To 25bar 3 Pass Coal Wood Fired Boilers With Steam Turbine 3 Mw With Iso Ce Certificate, Wholesale Various High Quality 1-30t/h 4

Power Plants Of The World - Diesel & Gas Turbine Worldwi

Power Plants Of The World - Diesel & Gas Turbine Worldwi

boiler plant with up to 175 MW thermal energy output to cover turbines and four steam turbines using sea water for the cooling

Back Pressure Turbine - China Back Pressure Steam Turbin

Back Pressure Turbine - China Back Pressure Steam Turbin

China Power Plant 4MW Generator Back Pressure Turbine, Find details about China Back Pressure Steam Turbine, Steam Engine Generator Sale from Power Plant 4

Steam Turbine, Steam Boiler, Power Plant, Steam Power: Foru

Steam Turbine, Steam Boiler, Power Plant, Steam Power: Foru

Sync Steam Turbine Generator - Basem Belal [2194] - Friday, January 11, 2019 277 Views Boiler pressure control View All - Hadi [2292] - Monday,

end studs for 1-1700MW high quality safe steam turbines

end studs for 1-1700MW high quality safe steam turbines

China Steam turbines steam turbines-S18A is supplied by Steam turbines manufacturers, producers, suppliers on Global Sources

22 MW ABB Steam Turbine Generator | Wabash Power Equipmen

22 MW ABB Steam Turbine Generator | Wabash Power Equipmen

The 22000 KW ABB Brown Boveri Steam Turbine Generator, available at Wabash Power, includes a lube oil reservoir with coolers, trip & throttle valve.

New 2016 Shin Nippon NEW 44 5 MW Steam Turbine Synchronou

New 2016 Shin Nippon NEW 44 5 MW Steam Turbine Synchronou

Buy New 2016 Shin Nippon NEW 44 5 MW Steam Turbine Synchronous Generator HV Transformer for sale by G & R National Electric Motor Sales - Berwick

20 MW CONDENSING STEAM TURBINE-GENERATOR

20 MW CONDENSING STEAM TURBINE-GENERATOR

Year of Manufacture: 1960Year Retired:2014Service Hours:~100,000Condition: ExcellentStatus: On the FoundationTurbineManufacturer : AEG Germany (now, Siemens)